Plastic shrinkage and rain check for flatwork. Evaporation rate from the ACI 305 nomograph (Menzel–Uno equation) and rain chance, now and hour by hour from the National Weather Service forecast.

Pour location

Enter a zip code, city, or street address, or use your location.

Plastic shrinkage cracking

–lb/ft²/hr

Enter a pour location above, or set the conditions by hand under Conditions.

Estimate only, not a guarantee. Cracking can occur at any rate.

Next 6 hours

Load a location to see the hourly outlook.

Concrete temperature

Conditions

Or try a scenario

°F
%
mph
Forecast wind is measured at 33 ft. ACI uses wind about 20 in. above the slab, roughly two-thirds of the forecast. This applies to the readout and every hour in the outlook. Turn it off for a handheld reading at the slab, or to stay conservative.